1998 S-10-E Electric Truck
EV1 System 110 Inverter/Drive train


Lead Acid PbA Leveling Charge Screens
Tech 2
These screen shots
review a leveling /
equalization charge
with PbA
programing.

The charge was
initiciated through the
Tech 2 Equalization
command @ 6:40am
as shown on the
clock.

Our idea in monitoring
this programing was
to review the times,
various stages, and
amperes of the charge
including various
other data including
battery temperatures.

These screens are
focused on status,
amperes and % SOC.  
Additional screens not
shown here trace
individual battery
voltages,
temperatures, cooling
status and
temperatures, etc.
Note the time @
3:10pm, now 8 1/2
hours into the the
Data 2 line 3 Charge
Status change to
"Equalizing" with a
drop to 1.7a.
Note the time @
4:20pm, now 9 hours
40 minutes into the
charge cycle, and the
Data 2 line 3 Charge
Status change to
"Floating" with a drop
to 0.2a.
At charge completion
the Charge Status
line has changed to
"Reset"